← Project explorer

Ohio / Evidence receipt

PORTS-Pike Technology Campus

publicly announcedAs of 2026-08-17Lifecycle status is not a quality score.
Developer
PORTS-Pike / SB Energy partners
Operator
Multiple planned operators; OpenAI capacity announced
Place
Pike County, Ohio
Utility
Project-specific; do not infer AEP tariff applicability
Grid context
PJM context; project interconnection details remain specific
Investment
Not consolidated in reviewed source
Power demand
~8 GW planned IT capacity
Construction jobs
35,000 projected over six-year buildout
Operating jobs
2,500 projected long-term roles
Cooling approach
Closed-loop, air-cooled design intent disclosed
Quantified water
Not disclosed
Community benefits
$80M combined community-fund commitments; up to $84M student technology credits
Tax incentives
Not consolidated
Reporting
Annual reporting planned

Evidence vintage

History stays visible when scope changes.

An earlier estimate and a later estimate may describe different project scopes, stages, or speakers. The timeline does not silently overwrite either.

  1. 2024-01-01proposed

    Earlier federal redevelopment descriptions used a smaller scope and different employment estimates.

  2. 2026-08-17expanded or revised

    OpenAI announced approximately 8 GW of planned IT capacity and updated sponsor projections.

What we do not know

Missing is not zero.

What kind of number is this?

Open every project claim.

Claims retain sponsor relationship, time status, geography, assumptions, and limitations.

Sponsor-reported

OpenAI announced an agreement for approximately 8 GW of planned IT capacity at PORTS-Pike.

OpenAI announced an agreement for approximately 8 GW of planned IT capacity at PORTS-Pike.

Sponsor-reported

The developer projects 35,000 construction jobs during a six-year buildout through 2032 and 2,500 long-term operating jobs.

The developer projects 35,000 construction jobs during a six-year buildout through 2032 and 2,500 long-term operating jobs.

Sponsor commitment

OpenAI and SB Energy describe $80 million in combined community-fund commitments, plus up to $84 million in student technology credits.

OpenAI and SB Energy describe $80 million in combined community-fund commitments, plus up to $84 million in student technology credits.

Unknown / not disclosed

PORTS-Pike discloses a closed-loop, air-cooled design intent, but exact expected annual water consumption has not yet been disclosed.

PORTS-Pike discloses a closed-loop, air-cooled design intent, but exact expected annual water consumption has not yet been disclosed.

Underlying record

OpenAIOpenAI joins PORTS-Pike projectInspect →U.S. Department of Energy Office of Environmental ManagementPORTS redevelopment documentationInspect →U.S. Department of Energy Office of Environmental ManagementPortsmouth SiteInspect →