Ohio / Project and utility territory

One major project.
One utility-specific rule.

BrooksFlow tracks the PORTS-Pike Technology Campus and AEP Ohio’s large-load tariff as separate evidence layers. The tariff is not a statewide Ohio rule, and BrooksFlow does not infer that it applies to PORTS-Pike without project-specific utility evidence.

~8 GW

PORTS-Pike planned IT capacity

A sponsor-announced plan, not energized load or annual electricity use. Project phasing and interconnection details remain important unknowns.

Project evidence reviewed through 2026-08-17
~25 MW+

AEP Ohio tariff scope

Qualifying data-center loads in AEP Ohio territory can face minimum-demand, financial-assurance, contract-term, and exit provisions. Applicability follows utility territory and the approved tariff.

Utility-specific, not statewide

Keep categories distinct

Announced capacity is not observed operation.

Go deeper

Open the project and rule separately.

Evidence and uncertainty

Commitment, requirement, and unknown are different states.

Sponsor projections are not observed outcomes. A utility rule does not automatically describe a project outside its documented scope.

Regulatory requirement

In AEP Ohio territory, qualifying data-center loads above about 25 MW can face minimum-demand provisions up to roughly 85% of contracted capacity and terms up to 12 years including ramp.

In AEP Ohio territory, qualifying data-center loads above about 25 MW can face minimum-demand provisions up to roughly 85% of contracted capacity and terms up to 12 years including ramp.

Sponsor-reported

OpenAI announced an agreement for approximately 8 GW of planned IT capacity at PORTS-Pike.

OpenAI announced an agreement for approximately 8 GW of planned IT capacity at PORTS-Pike.

Sponsor-reported

The developer projects 35,000 construction jobs during a six-year buildout through 2032 and 2,500 long-term operating jobs.

The developer projects 35,000 construction jobs during a six-year buildout through 2032 and 2,500 long-term operating jobs.

Sponsor commitment

OpenAI and SB Energy describe $80 million in combined community-fund commitments, plus up to $84 million in student technology credits.

OpenAI and SB Energy describe $80 million in combined community-fund commitments, plus up to $84 million in student technology credits.

Unknown / not disclosed

PORTS-Pike discloses a closed-loop, air-cooled design intent, but exact expected annual water consumption has not yet been disclosed.

PORTS-Pike discloses a closed-loop, air-cooled design intent, but exact expected annual water consumption has not yet been disclosed.